
New TopShim run:

version = topshim 2.0.0
date = 2024-02-28
time = 22:25:41.831
command = topshim 

FINE SHIMMING

Parameters:

probe = Z820201_0105
solvent = CDCl3
shim nucleus = 2H
nucleus optimised for = 13C
o1p (from lock) = 7.24 ppm

Results:


1D Shimming:
Iteration  1: FWHM Before= 2.1 Hz, Target= 0.3 Hz, After= 0.5 Hz
Iteration  2: FWHM Before= 0.5 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  3: FWHM Before= 0.4 Hz, Target= 0.3 Hz, After= 0.4 Hz
Iteration  4: FWHM Before= 0.4 Hz, Target= 0.4 Hz
Shim succeeded

Lineshape quality factor (1D spectrum, spinning) = 0.586

shim changes: 
Z	-19
Z2	+84
Z3	-681
Z4	-606
Z5	+2716

duration = 55 sec
completed successfully
finished Wed Feb 28 22:26:35 2024


========================================================================
